Layers  /  Risks and restrictions

What can stop your plans on this land

A protection zone can stop you building. A flood area can stop the bank. Know the registered restrictions.

Land Register entries (mortgages, prohibitions) are not included — check them before you sign.

Free account · no card · 4 property reports a day

Hand-drawn map of Rēzekne with zoning, flood areas, corridors and contaminated sites painted over it
Rēzekne Town parcel
Cadastre21000110433
On one parcellake zone, defence site zone, 2 heritage zones
Local plan zoningFlood areasPower line, gas and road corridorsContaminated sites
13
restriction and risk layers
62%
of Latvia's area has digital local plan zoning
38 of 42
municipalities with local plan flood areas
5 Oct 2026
local plans as of

Binding or informational

Law, or a warning

Some layers are law: zones registered in the cadastre and local plans. Others are a warning: flood hazard maps and zones drawn from OpenStreetMap. The table says which is which.

  • Binding · cadastre encumbrances, local plan zoning and flood areas
  • Informational · flood hazard maps, corridors from OpenStreetMap
Flood areas and local plan zoning in Jūrmala
Flood areas and zoningJūrmalalocal plans 5 October 2026

Registered encumbrances

The list the notary will read

The cadastre lists encumbrances for most parcels: protection zones, easements and heritage. Tap a parcel to see its list. Registered encumbrances as of 12 October 2026.

Power line and water protection zones near Turki, Līvāni municipality

Sources and accuracy

LayerWhat it showsSourceData as ofBindingAccuracy
ZoningLocal plan zoning: what may be built whereSpatial Development Planning System5 October 2026YesCovers about 62% of Latvia's area; some municipalities have no digital plan
Burdened areasBurdened areas set in local plansSpatial Development Planning System5 October 2026YesPlan scale; partial coverage
Special conditionsAreas with special conditions in local plansSpatial Development Planning System5 October 2026YesTypes are not told apart on the map
Scenic landscapesScenic landscape areasSpatial Development Planning System5 October 2026YesPartial coverage
Villages and townsVillage and town boundaries, which change zoning rulesState Address Register5 October 2026YesAddress boundary; the local plan boundary can differ
Power linesPower lines and substationsOpenStreetMap2 July 2026ApproximateMany lines up to 20 kV are missing
Gas pipelinesGas pipelines and their safety zoneOpenStreetMap; zone width from the national cadastre2 July 2026ApproximateOperational zone about 15 m, safety zone up to 150 m
WaterRivers, lakes and their protection zonesLatvian Environment, Geology and Meteorology Centre; OpenStreetMap2 July 2026ApproximateMeasured from the centre line, rural width
Roads and railwaysRoads, railways and their protection zonesOpenStreetMap2 July 2026ApproximateRural width; in towns the local plan decides
FloodsFlood areas: binding local plan areas and flood hazard maps (10% and 1%)Spatial Development Planning System; Latvian Environment, Geology and Meteorology Centre5 October 2026 / 15 August 2026Local plan: yes. Hazard maps: noLocal plan flood areas exist in 38 of 42 municipalities
Contaminated sitesContaminated and possibly contaminated sitesLatvian Environment, Geology and Meteorology CentreOctober 2024 editionYesStatic register edition
Construction casesConstruction cases: new buildings, active and finishedConstruction Information SystemOpen dataNoNo planned projects or public consultations

Two switches turn on all restrictions and all risks.

Check these yourself

What the registers cannot tell you.

  • Whether a deal needs defence ministry consent near the state border or defence sites.
  • A drawn protection band along power lines. The width depends on voltage, forest and distance from the outer wire.
  • Storm surge, ice jam and 0.5% flood areas, and local plan flood areas in some municipalities.
  • Exact water protection zones. Ours are measured from the centre line, not the bank, and use the rural width inside villages.
  • Zoning details on the map. Zone names, special condition types and plan dates are in the property report.
  • Planned buildings and public consultations.
  • Gas compressor stations and wells as zones, and some pipeline sections.

Know the limits before you make an offer

The registered restrictions, listed in one PDF.

No card. 4 property reports a day included. Land Register entries (mortgages, prohibitions) are not included — check them before you sign.

KALME shows what official registers and open data say. It is not legal advice or a survey. Check with the relevant authority before you sign.